Login utility has been upgraded from 01-Feb-2023. Please follow below steps: Click Here For Details
Close
1. Uninstall Nxt crypto setup from Control panel
2. Uninstall Nxt crypto service set up from Control panel
3. Download and install Dc setUp from System Requirements
4. Download and install Nxtcrypto service SetUp from System Requirements
5. Reset the browser.
6. For more details, kindly refer the link Click here

List of supported e-Tokens is available in “Guideline For E-token” link. Tokens other than the listed tokens may misbehave.
Event No. Event Description
Start Date <=
Last Date >=

Event No. Event Ref.No. Event Type Type Event Description Last Date/Time Corrigendum Document / Count
5447 WALCHAND COLLEGE OF ENGG./WIC/LAPTOPS/NOV/2023 Tender Open Tender Document for Supply, Testing of Laptops 09/12/2023 18:00:00
9 Days Remain
5444 MAHAPREIT/CCC/SEP/03/11/23 Tender Open REQUEST FOR PROPOSAL (RFP) of Supply, Implementation and Monetization of Fiber Network on Opex Model for a Period of 20 Years 13/12/2023 15:00:00
13 Days Remain
5439 Walchand College of Engineering,Sangli/P&D Cell/Renovation of civil dept.phase-2/Nov/2023 Tender Open Tender for Renovation of Civil Department - Phase 2 02/12/2023 17:30:00
2 Days Remain
5423 MAHAPREIT/23-24 /RFP/MMCH/1_1 Tender Open REQUEST FOR PROPOSAL (RFP) for APPOINTMENT OF CONSULTING FIRM AS PROJECT DESIGN AND MANAGEMENT CONSULTANT FOR THE DEVELOPMENT OF MEDI CITY 08/12/2023 15:00:00
8 Days Remain
5393 MAHAPREIT/REEM-08/23-24 Tender Open Tender for Design, Engineering, Supply, Construction, Erection, Testing and Commissioning of 100 MW(AC) Crystalline PV technology based grid interactive distributed agriculture feeder Solar PV Power plants including five (05) years of comprehensive Operation & Maintenance on EPC basis at various locations in the state of Maharashtra 29/12/2023 15:00:00
29 Days Remain
5373 MAHAPREIT/SEP-02/06-23 Tender Open Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning, and five (05) years comprehensive Operation & Maintenance of total 50 MW(AC) grid connected solar PV power plant 31/12/2023 15:00:00
31 Days Remain
Latest News